Hyundai - Forsgate













This was the second project for repeat customer Forsgate / Herrod Construction. This building was a 300,000 SF warehouse in South Brunswick, NJ and was also a very well located building. In this case adjacent to Exit 8A with visibility from the Turnpike. The building had been built in 1990 and had a clear height of 26’ which was typical for the market at that time. Since that time however warehouse technology has evolved to where it is feasible to store much higher than in traditional facilities. New buildings in this market are being built to 40’ clear height. In 2009 in order to keep our building competitive with these newer ones we made the decision to raise it. ISE performed the lift in halves, split at the expansion joint. The lift was 15’-3” (from 28’-8” at the perimeter wall to 43’-11”). This building has since been leased to a company that “fills the cube” with a high rack system throughout the warehouse.
Project Name : | Hyundai - Forsgate |
Location : | South Brunswick, New Jersey |
Building Square Footage : | 303,160 |
Pre Lift Roof Height : | 28'8" |
Post Lift Roof Height : | 43'11" |
Roof Lifted : | 15'3" |
Added Cubic Feet : | 4,244,240 |
Project Completion Date : | 2010 |